X

Sign up for Equitymaster's free daily newsletter, The 5 Minute WrapUp and get access to our latest Multibagger guide (2019 Edition) on picking money-making stocks.

This is an entirely free service. No payments are to be made.


Download Now Subscribe to our free daily e-letter, The 5 Minute WrapUp and get this complimentary report.
We hate spam as much as you do. Check out our Privacy Policy and Terms Of Use.
Identifying a power stock: Do's and Don'ts - Views on News from Equitymaster

Helping You Build Wealth With Honest Research
Since 1996. Try Now

  • MyStocks

MEMBER'S LOGINX

     
Login Failure
   
     
   
     
 
 
 
(Please do not use this option on a public machine)
 
     
 
 
 
  Sign Up | Forgot Password?  

Identifying a power stock: Do's and Don'ts

Sep 6, 2003

"When you think of digitizing India there will be a massive amount of power required and I pray to this government that you have to push and push and push to invest in infrastructure - Mr. Jack Welch"Profile
Power can be generated from water (hydro), thermal (coal or naphtha), wind and nuclear. Since the Indian power sector has not been opened up for private sector participation in its true sense, the centre and state governments have a major role to play. It is a politically sensitive sector i.e. tariffs cannot be hiked as the vote bank could be affected.

A power company can be a generator, a transmitter, a distributor or a combination of all three. Barriers to entry are high because it is capital intensive and regulated. While technology in state government undertakings is poor, it will play a big role in the future, as consumers will require good quality and uninterrupted supply of power. Currently, in India, we have 1,07,533 MW of generation capacity out of which private sector contributes 11%. Let's have a look at the revenue model for a power company.

Total revenues = Revenues from generation + transmission + distribution.

Generation
For a company involved in generation of power, revenues will be a function of electricity generated and tariffs applicable. Generation of electricity is a function of PLF (plant load factor) and the capacity installed. PLF, in simple words, is like capacity utilisation. The level of PLF varies depending upon the kind of generation plant. Generally, a hydro power plant or a wind energy plant have low PLF (industry average 35%-50%). Thermal and nuclear power plants have higher PLF (industry average 50%-65%), which ultimately results in higher production.

Investment in capacity in the power sector depends on various factors like: demand-supply gap (in simpler words we can say deficiency), availability of funds, economic growth and regulatory framework. All these factors are inter-related to some extent.

Demand and supply
One critical factor when it comes to analyzing a power company is the fact that demand expands as per supply. There is nothing like a 'market size' per se. The level of the growth in the industrial sector, per capita consumption of consumer durable and electronic goods would indicate the growth potential. For instance, the penetration level of air conditioners in India is just 0.5%. If more people buy A/C or television or refrigerator, demand for power will increase. Therefore, as far as demand-supply gap for a developing economy like India is concerned, it is irrelevant. The country is power deficient.

Availability of funds
As we had mentioned before, the sector is capital intensive. It costs almost Rs 40 m to Rs 45 m to set up one megawatt (MW) of capacity. If a company is planning to increase capacity by 1,000 MW, it requires Rs 40 bn. From a retail investor perspective, look at the cash balance and the current debt to equity ratio of the company from the balance sheet. This will give an idea whether the company really has the muscle power to expand the stated capacity in the time frame mentioned.

Economic Growth will lead to increase the purchasing power of the people, which will raise the living standard and in turn increase electricity demand. So, the circle starts again.

Regulatory framework
If a company is just into generation, it has to supply to a distributor for realising value for the quantity of power sold. If the distributor is a SEB (i.e. state electricity board), the chances of delayed payment are high, as SEBs are in poor state. Failure to receive money from SEBs could hamper a company's capacity expansion plans.

Having looked at the capacity side, consider factors involved on the tariffs front.

For a generation company that supplies electricity to a SEB, the respective state governments fix tariffs. However, a power generation company can also supply to the national grid at a specific rate. The national grid say, Power Grid Corporation, in turn could take the onus of meeting SEB requirements. While the advantage is lower risk of delayed payment and fewer losses on account of T&D, the disadvantage is that the tariffs are lower compared to a T&D player. To put things in simple terms, the generation company gets a specific rate on power supplied whereas it is not the case with a T&D player where there is differential tariff structure.

For a distribution company (like Tata Power or BSES in Mumbai), tariffs are different depending upon the customers. Usually, industrial units are charged higher as compared to households (cross-subsidisation). Agricultural sector is a mixed bag. While some states actually charge for power supplied (like Tamil Nadu), in most other states, it is free. The advantage for a generation and distribution company is that it can pass a rise in cost to customers in a deregulated market. However, power theft and default rates are high for a distribution major. Watch out for this as well.

Transmission
There can be independent transmission companies as well (like backbone service providers in the telecom sector). The revenue model is similar. A transmission company buys power from a generation company and hands it over to SEBs or a distribution company. When it comes to advantages, it is like less capital and technology intensive. But a transmission company faces the risks of default of payment by a distributor, high leakage losses and a cap on transmission charges. Approximately 30%-35% or power generated is lost in transmission currently.

Distribution
The distribution company can also generate electricity in-house, but the process remains same. Distribution Companies have pre-defined areas called 'circles' where they can supply electricity. For a distribution company, metering plays a vital role. Metered units = Inhouse power generated (if any) + Power sourced from a generator to meet additional requirement - T&D losses. A major concern for the Indian distribution companies is heavy T&D losses due to poor infrastructure. Due to weak anti-theft laws, 10%-15% of power supplied is lost in distribution.

Key operating and financial parameters to be looked at

  • Guaranteed return: A power company is guaranteed a certain return on capital employed on generation by the government. If input cost increases, a generation company passes on the cost through increasing the capital employed to maintain margins. Watch out whether there is a possibility of the government reducing the guaranteed return. If it does, it could affect profitability of a power company.

  • Valuing a power company: Since this sector is all about assets, arriving a NAV is important from a retail investor perspective. It is simple and information is available in the balance sheet itself. As we mentioned earlier, it costs around Rs 40 m - Rs 45 m to set up one MW of capacity (including distribution costs). For a pure generation company, it could range between Rs 20 m to Rs 25 m.

    NAV = (Capacity * rate per MW depending whether it is pure generation company or a combination of both) - Debt + Cash. Divide NAV by number of shares outstanding to get an approximate NAV. This could serve as a benchmark.

  • Dividend yield: Since power companies have strong cash flows, dividend is one key parameter to look at. Dividend yield is a very useful parameter. But if the company is in the process of expanding capacity, the dividend payout is unlikely to be high in initial years.

Apart from what all has been said above, the investor needs to look at the past record of the management, its vision and its focus on business. After all it's the management of the company who is the final decision-maker and the future of the company solely depends on the decisions taken by it.

Click here to identify stocks from other sectors.

Related Links for Power Sector: Quarterly Results NEW | Sector Analysis Report | Sector Quote | Over The Years


Equitymaster requests your view! Post a comment on "Identifying a power stock: Do's and Don'ts". Click here!

  

More Views on News

NTPC: Higher Tax Provision Impacts Profits (Quarterly Results Update - Detailed)

Mar 30, 2017

NTPC declared results for the quarter ended December 2016. The company reported revenue growth of 10.9% while profits declined by 7.5% YoY.

More Views on News

Most Popular

Are You Ready for the Big Nifty Move in the March Expiry?(Profit Hunter)

Mar 8, 2019

History suggests the Nifty could make a big move in March. Are you prepared to benefit from this opportunity?

5 Fundamentally Strong Stocks to Pick for Trading Today(Profit Hunter)

Mar 15, 2019

5 fundamentally strong stocks one could buy to trade in this market right now. Make sure you grab the chance this strongly rallying market offers.

Elections Don't Matter!(The Honest Truth)

Mar 13, 2019

Ajit Dayal shows us why from the point of view of the Indian economy, elections don't matter.

Two Growth Stocks that Doubled in a Little Over 12 Months!(The 5 Minute Wrapup)

Mar 13, 2019

The elements that fueled profit growth for these two companies led to a surge in their stock prices.

This is Why You Need to Buy Small Cap Stocks Now(The 5 Minute Wrapup)

Mar 15, 2019

Did you just miss the smallcap rally? Or is there still time to catch up? Read on for answers and more...

More

Get the Indian Stock Market's
Most Profitable Ideas

How To Beat Sensex Guide 2019
Get our special report, How to Beat Sensex Nearly 3X Now!
We will never sell or rent your email id.
Please read our Terms

S&P BSE POWER


Mar 20, 2019 (Close)

S&P BSE POWER 5-YR ANALYSIS

COMPARE COMPANY

MARKET STATS